可行性分析和投资评估

一份可行性报告可以帮你分析出对土地投资的不同形式和阶段的潜在回报,同时也对项目下一步发展起到指导作用。我们的可行性分析会综合法律、实践、预算等方面进行分析,帮你清晰投资。

下边的小工具告诉你不同投入阶段的产出,以及获得该产出和回报需要做的事情。工具仅演示一般情况,具体案例还需要和我们一起有针对性地商讨分析。

可行性分析

一般来讲我们可行性报告的原则是:
  • 最大投资回报
  • 设计和施工质量
  • 尽量低的时间投入

Investment Rate

 

你将在3个月内获得资源许可批文

资源许可批文可以允许你对土地进行进一步分割和出售。
A resource consent gives approval for things like the use or subdivision of land, the taking of water, the discharge of contaminants in water, soil or air, or the use or occupation of coastal space. It matters not only your house, but also the area that you’re living in. To get a resource consent, you’ll need several things to be done:
  • Topo Survey
  • Architecture Design
  • Engineering Specifications
  • Assessment of Environmental Effects
  • S92 Response

你将在6~12个月获得土地所有权证书

当你获得一块土地的所有权证书你就可以出售或者转让这块土地。
Subdivision is for land owner to divide a piece land or buildings into separate parts in terms of legal matters. Subdivided land can be sold or split into separate ownership. To do so a subdivision consent is required from the local Council. It’s also required to alter a boundary between two properties. Subdivision can also involves in urban infill development or re-development, and greenfield new town subdivision. To get a certificate of title you’ll need several things to be done:
  • Resource Consent
  • Building Consent
  • Engineering Plan Approval
  • Compliance (s223, s224c)

你将在12~18个月左右完成房屋建造

你将得到拥有所有权证书的房屋。
With consents and plans it’s time to finally kick off building up the house. You don’t need to know any complicated engineering specifications. Simply you can delegate Topland to lead the construction work and control time and cost.
  • Construction Work
  • Project Management

投资
回报
1
2
3
投入:$
回报:$$
投入:$$
回报:$$$$$
投入:$$$
回报:$$$$$$

你将在3个月内获得资源许可批文

资源许可批文可以允许你对土地进行进一步分割和出售。
A resource consent gives approval for things like the use or subdivision of land, the taking of water, the discharge of contaminants in water, soil or air, or the use or occupation of coastal space. It matters not only your house, but also the area that you’re living in. To get a resource consent, you’ll need several things to be done:
  • Topo Survey
  • Architecture Design
  • Engineering Specifications
  • Assessment of Environmental Effects
  • S92 Response

你将在6~12个月获得土地所有权证书

当你获得一块土地的所有权证书你就可以出售或者转让这块土地。
Subdivision is for land owner to divide a piece land or buildings into separate parts in terms of legal matters. Subdivided land can be sold or split into separate ownership. To do so a subdivision consent is required from the local Council. It’s also required to alter a boundary between two properties. Subdivision can also involves in urban infill development or re-development, and greenfield new town subdivision. To get a certificate of title you’ll need several things to be done:
  • Resource Consent
  • Building Consent
  • Engineering Plan Approval
  • Compliance (s223, s224c)

你将在12~18个月左右完成房屋建造

你将得到拥有所有权证书的房屋。
With consents and plans it’s time to finally kick off building up the house. You don’t need to know any complicated engineering specifications. Simply you can delegate Topland to lead the construction work and control time and cost.
  • Construction Work
  • Project Management